Invitation Letter
Date: 18.02.2026
Subject: Invitation to the Local Stakeholder Meeting for the “Al-Muwaqqar Amman Plastic Recycling Project”
Dear Stakeholder,
We, Shining Environment for Sustainability and Plastic Industries Co., are the investor for the project activity titled “Al-Muwaqqar - Amman Plastic Recycling Project”.
The Local Stakeholder Meeting for the “Al-Muwaqqar - Amman Plastic Recycling Project”, owned by Shining Environment for Sustainability and Plastic Industries Co. and conducted under the Verra Plastic Waste Reduction Standard will be held at our plant in Al-Muwaqqar, Amman, Jordan.
You are defined as a Local Stakeholder within the scope of the aforementioned project activity. In this context, we welcome any comments or opinions you may have and invite you to the Local Stakeholder Meeting to be held by us.
The details of the meeting are provided below.
| Organizer | Shining Environment for Sustainability and Plastic Industries Co. | |||
| City | Amman, Jordan | Date | 18.03.2026 | |
| District | Al-Muwaqqar | Start Time | 11:00 a.m. | |
| Neighborhood | Al-Nuqquirah lands | End Time | 01:00 p.m. | |
| Location | Econest Plant | |||
رسالة دعوة
التاريخ: 18/02/2026
الموضوع: دعوة لحضور اجتماع أصحاب المصلحة المحليين لمشروع الموقر – عمّان لإعادة تدوير البلاستيك
اعزائي اصحاب المصلحة،
نحن، شركة البيئة المشرقة للاستدامة والصناعات البلاستيكية، المستثمر في مشروع "الموقر - عمّان لإعادة تدوير البلاستيك".
سيُعقد اجتماع أصحاب المصلحة المحليين لمشروع "الموقر - عمّان لإعادة تدوير البلاستيك"، المملوك لشركة البيئة المشرقة للاستدامة وصناعات البلاستيك، والذي يُنفذ وفقًا لمعيار( فيرا) (Verra) للحد من النفايات البلاستيكية، في مصنعنا في الموقر، عمّان، الأردن.
أنتم تُعتبرون من أصحاب المصلحة المحليين في نطاق المشروع المذكور.لذا، نرحب بأي تعليقات أو آراء لديكم، وندعوكم لحضور اجتماع أصحاب المصلحة المحليين الذي سنعقده.
تجدون تفاصيل الاجتماع في الجدول أدناه.
| المنظم | البيئة المشرقه للاستدامة و الصناعات البلاستيكية | ||||
| المدينة | عمان,الاردن | التاريخ | 18/03/2026 | ||
| لواء | الموقر | وقت البداية | 11:00 | ||
| الحي | النقيره | وقت النهاية | 13:00 | ||
| الموقع | شركة البيئة المشرقة مصنع (Econest) | ||||
Local Stakeholder Consultation Meeting
The Büyükkışla Wind Power Plant with Energy Storage Project is being developed under the GS4GG Carbon Certification framework. In line with the principles of transparency and inclusiveness, a Local Stakeholder Consultation Meeting will be held as part of the project development process.
The purpose of the meeting is to inform local stakeholders about the project, collect their views and recommendations, and incorporate this feedback into the carbon certification process.
Meeting Details
Venue: Şereflikoçhisar Büyükkışla Neighborhood Culture and Solidarity Association Hall
Date: 21 February 2026
Time: 14:00
All stakeholders who may be directly or indirectly affected by the project are invited to attend the meeting.
Stakeholders who are unable to attend the meeting may submit their comments and suggestions in writing up to the meeting date.
For comments and feedback:
https://climatebalanced.com/contact
Yerel Paydaş Katılım Toplantısı
Büyükkışla Depolamalı Rüzgâr Enerjisi Santrali Projesi, GS4GG Karbon Sertifikasyonu kapsamında geliştirilmekte olup, proje sürecinin şeffaflık ve katılımcılık ilkeleri doğrultusunda Yerel Paydaş Katılım Toplantısı düzenlenecektir.
Toplantının amacı; proje hakkında yerel paydaşları bilgilendirmek, görüş ve önerilerini almak ve bu geri bildirimleri karbon sertifikasyon sürecine dâhil etmektir.
Toplantı Bilgileri
Yer: Şereflikoçhisar Büyükkışla Mahallesi Kültür ve Dayanışma Derneği Lokali
Tarih: 21 Şubat 2026
Saat: 14:00
Projeden doğrudan veya dolaylı olarak etkilenmesi muhtemel tüm paydaşlar toplantıya davetlidir.
Toplantıya katılamayan paydaşlar, görüş ve önerilerini toplantı tarihine kadar yazılı olarak tarafımıza iletebilirler.
Yorumlarınız için:
https://climatebalanced.com/contact